WIT Press

Computer Aided Construction Of Timetables On Long Route Sections

Price

Free (open access)

Volume

6

Pages

8

Published

1994

Size

627 kb

Paper DOI

10.2495/CR940051

Copyright

WIT Press

Author(s)

V. Klahn & H. Dannenberg

Abstract

In complex railway systems even small alterations to individual compo- nents can have wide repercussions. This makes computer-assist methods indispensable in both planning and operations control tasks. Especially the planning of timetables on long route sections will be much faster by com- putering those tasks, which currently still depends a lot on experience and intuition. For this purpose the interaktive construction programme SIMU- PLAN was developed on the basis of the simulations model SIMU VII at the Institute for Transport, Railway Construction and Operation (IVE) at Hannover University. 1 Model components SIMUPLAN is fitted into the data and programme environment of the si- mulation system SIMU VII (Klahn [2]). This minimizes the effort of data acquisation and also m

Keywords



Warning (2) : foreach() argument must be of type array|object, null given [in /var/www/dce7ae55-385b-4ffa-8595-3ec5e61ff110/public_html/app/templates/Papers/view.php, line 364]