The MINLP Optimization Of Tunnel Intake Bulkheads At Sultartangi Hydroelectric Project Iceland

Price

Free (open access)

Volume

40

Pages

10

Published

1999

Size

927 kb

Paper DOI

10.2495/OP990101

Copyright

WIT Press

Author(s)

S. Kravanja, Z. Kravanja & B.S. Bedenik

Abstract

The paper presents optimization of sliding hydraulic steel gates Tunnel intake bulkheads, erected in Sultartangi Hydroelectric Project, Iceland. The gates have been optimised by the Mixed-Integer Non-Linear Programming optimization approach (MINLP). The MINLP optimization approach to structural synthesis is performed through three steps: i.e. the generation of a mechanical superstructure, the modelling of an MINLP model formulation and the solution of the defined MINLP problem. As the discrete/continuous optimization problem of the gates is non-convex and highly non-linear, the Modified Ou

Keywords



Warning (2) : foreach() argument must be of type array|object, null given [in /var/www/dce7ae55-385b-4ffa-8595-3ec5e61ff110/public_html/app/templates/Papers/view.php, line 364]